WELCOME to Freemium Subscription
exclusively by New In Signal...

Monthly updates and articles by New In Signal

Latest News | INFRACERT d.o.o. is a Designated Body and Notified Body in Croatia (NB 3014), together with mother company INFRACERT TSI sp. z o.o. (NB 2738)

WHAT IS NEW IN INFRACERT

We provide NoBo assessment according to the TSI, together with Infracert TSI sp. z o.o. Poland, and DeBo conformity assessment of the following subsystems in accordance with the National rules in Croatia:
Energy subsystem
Trackside Control-command and signalling subsystem
On-board Control-command and signalling subsystem
Rolling stock

Our vision is that INFRACERT d.o.o. becomes the leading institution for the certification of railway subsystems in Croatia and the region, which, by applying advanced technological solutions in the certification and quality control process, contributes to the development of the transport network and the creation of a coherent, interoperable and multimodal transport network with unique and high technical parameters throughout the EU.

DeBo activities
DeBo is responsible for issuing the certificate of conformity for subsystem/vehicle/component. DeBo checks whether the project meets the requirements of the national technical rules.
In past years INFRACERT d.o.o. issued DeBo certificates of conformity for:
• Dual-system electric locomotives type Traxx F160 AC3 and F140 AC2
• Multi-system electric locomotives type Vectron
• Stadler trainsets FLIRT 3 EMU and FLIRT 3 DMU
• Lokomotiv Softronic Transmontana
• Railjet new generation (DANI) -passenger coaches of family Viaggio N
• Development of a multimodal platform in the Port of Rijeka and connection with the Jadranska vrata container terminal (POR2CORE-AGCT)
• Dolac railway-road crossing at km 17+084 of the railway line R106 Zabok-Krapina-Đurmanec-DG

DoBo projects which are currently in implementation:
• Obtaining certificates of conformity of structural subsystems according to national rules by the designated body DeBo in accordance with ZOSI NN63/20 for the design phases (main and detailed designs) and execution of works for the project “Reconstruction of the existing and construction of the second railway track on the Dugo Selo – Križevci section
• Obtaining the Declaration of Conformity of Structural Subsystems according to National Technical Rules (DeBo) for the project “Reconstruction of the existing track and construction of a second track on the Križevci-Koprivnica-state border sect

NoBo activities
NoBo is responsible for issuing the “EC” certificate of conformity for the subsystem or component. NoBo checks whether the subsystem/component meets the requirements of the corresponding Technical Specifications for Interoperability (TSI).
Basic procedure of certification is shown on the image below:

In past years INFRACERT d.o.o. issued NoBo certificates of conformity for:
• Development of a multimodal platform in the Port of Rijeka and connection with the Jadranska vrata container terminal (POR2CORE-AGCT) – reconstruction of Rijeka Brajdica station and Brajdica container terminal
• Modernization and electrification of the Zaprešić-Zabok railway line

NoBo projects which are currently in implementation:
• Issuance of certificates of conformity of structural subsystems according to national rules by the notified NoBo body in accordance with ZOSI NN63/20 on the prepared project documentation (conceptual and main project) for the modernization of the railway line on the section Zagreb Glavni kolodvor- Hrvatski Leskovac
• Issuance of certificates of conformity of structural subsystems according to national rules by the notified NoBo body in accordance with ZOSI NN63/20 on the prepared project documentation for the modernization of the railway line M606 Knin-Zadar on the Knin-Radučić and Dalmatinska Ostrovice-Bibinje sections and the construction of the railway bypass of the settlement of Bibinje and the freight Gaženica station on the M606 line
• Obtaining certificates of conformity of structural subsystems according to national rules by the notified NoBo body in accordance with ZOSI NN63/20 for the design phases (main and detailed designs) and execution of works for the project “Reconstruction of the existing and construction of the second railway track on the Dugo Selo – Križevci section

Our partners
We cooperate with the best Croatian faculties and institutes, as well as other leading companies in Croatia and Europe:

For more information, please visit https://infracert.hr/

Subscription Plans

Subscribe and enjoy unlimited access to Newsletters

Free

Subscribe Now for FREE

Basic

Monthly fee 9,99 CHF

Premium

Monthly fee 12,99 CHF