WELCOME to Freemium Subscription
exclusively by New In Signal...
ASK THE DOC | Monthly articles by Doc Frank Heibel
HIGH PERFORMANCE SIGNALLING | Doc Frank Heibel
Where Do You Test That?
At the end of last month’s article, I planted a seed. I wrote about Digital Automatic Coupling (DAC) and its significance for ETCS deployment on freight corridors. The argument was straightforward. DAC enables continuous monitoring of train integrity across a freight consist, which in turn makes Hybrid Train Detection (HTD) viable for freight. And HTD, as I explained, is arguably the greatest practical step forward for ETCS capacity since the technology was invented. A genuine unlock.
The final paragraph of that article contained a sentence I want to pick up today. I wrote that the interface between DAC-enabled train integrity reporting and ETCS onboard and trackside systems is “precisely the kind of thing that needs rigorous, independent validation before it goes near a live railway.”
I meant every word of it. And today I want to explain why.
The Testing Problem Nobody Talks About
Railway signalling has always had a testing problem. Not a shortage of testing, quite the opposite. Every project tests extensively. The problem is where and how that testing happens.
For most of the history of ETCS deployment, serious integration testing has been done in one of three ways. First, on the live railway, in possessions, at great inconvenience and cost. Second, on dedicated test tracks, where they exist, in countries that had the foresight and funding to build them. Third, at supplier test facilities, where the environment is controlled but, critically, the equipment under test is always that supplier’s own.
To read more about this article and to have full access to premium content SUBSCRIBE to Basic Subscription Plan or Premium Subscription Plan.
HIGH PERFORMANCE SIGNALLING | Monthly Articles
Ask Doc Frank Heibel
Articles by Doc Frank Heibel
What is High Performance Signalling?
First of all, welcome dear reader to my column about “High Performance Signalling”. I hope you find these articles insightful and instructive and will do my best to give you premium “food for thought” as well as practical and applicable advice. Yet it is prudent to add this…
So what do I mean by High Performance Signalling? And why do I think that CBTC provides that more than ETCS or any other mainstream signalling technology?
I coined that term High Performance Signalling around 2016 because I thought, and still think, that the popular (at least here in Australia) term High Capacity Signalling…
ask the doc | doc frank heibel
Subscription Plans
Free
Subscribe Now for FREE
- Free registration
- Timely updates
- Free Handbook Download
- Access to Newsletter Issues
- Access to introduction sections
Basic
Monthly fee 9,99 CHF
- Free registration
- Timely updates
- Free Handbook Download
- Access to Newsletter Issues
- Free access to the paid articles
Premium
Monthly fee 12,99 CHF
- Free registration
- Timely updates
- Free Handbook Download
- Access to Newsletter Issues
- Access to introduction sections
- Free access to the live events with our top authors
